During the last two weeks a new UPS was deployed to our main server room here at the "Vorklinik" basement.

It now supplies our various network and server hardware with 60 kVA of power in case of an outage in the main power grid. Running just the absolutely necessary systems (ie. without redundancy systems online) this keep our infrastructure up and running for about 60 minutes.

It a later stage of extension a current generator will be connected to the new UPS to take over the power consumption load and extend the period of autarky.

[gallery link="file"]